Railway Infrastructure

Basic design, detailed design Luka Koper – KT

Luka Koper, tracks 31-36 (feasibility study 1)

Luka Koper, tracks 11 in 12b (Detailed design: feasibility study 2)

Luka Koper – replacement of switch No. 128 (tracks 5 and 6: feasibility study 3)

Conceptual design Luka Koper KT (new tracks 21A, B, C)

Luka Koper – regulation of tracks No. 19 and 20 (feasibility study 4)

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.