Luka Koper KT

TRACK NO. 21 A, B, C AT THE BUSINESS CENTER OF THE CONTAINER TERMINAL WITH A BRIDGE OVER THE OVERFLOW CHANNEL OF THE ŠKOCJANSKI ZATOK

Due to the increased throughput, which is still on the increase, the investor wishes to increase the capacity of the container terminal. The basic design and detailed design project was made to extend the track group from no. 24 to 22 for two additional tracks no. 21a and 21b on the south side of the group. The connection of the two tracks to the existing network will be via the switch No. 101, which is moved to track No. 1f and continues with the track parallel to the existing No. 25C over the new bridge over the Škocjanski zatok to the switching area. The new bridge is designed as an integral, prestressed reinforced concrete construction with prestressed prefabricated beams and an “in situ” reinforced concrete plaque. The length of the bridge is about 55 m.

Additional information

  • Contracting Authority: Luka Koper d.d.
  • Project phase: Basic design, detailed design

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.