Detailed design of cycling track Modrej pri Tolminu

The route of the cycling track runs along the main road, in a narrow lane between the main road and the lake. The beginning of the processing section begins with a connection to the macadam path in the stationary km 0,000 (the stationary of the road km 5,038). On the stationary from km 5,182.69 to km 5,207.69 it will cross the stream Vodivček. At this point the track will run across the cycling bridge, as the existing road bridge is too narrow. The cycling track then departs a little from the lake and then approaches it again at the stationary km 5,523. From km 5,619.40 to km 5,797 there is a newly built gallery Pod Ključem, along which has already been completed a section of a cycling track for mixed traffic of cyclists and pedestrians in the width of 2.0 meters. In front of and behind the above-mentioned gallery, a cycling link takes place on a large part of the track on supporting structures. At the end of the processing section, the track connects to an existing macadam path.

Additional information

  • Contracting Authority: The municipality of Tolmin
  • Project phase: detailed design, as-built design

_IMAGE GALLERY

_see our other projects

Implementation plan of facilities in the Laško-Celje section

Preliminary design, basic design motorway Gruškovje

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.