The route of the cycling track runs along the main road, in a narrow lane between the main road and the lake. The beginning of the processing section begins with a connection to the macadam path in the stationary km 0,000 (the stationary of the road km 5,038). On the stationary from km 5,182.69 to km 5,207.69 it will cross the stream Vodivček. At this point the track will run across the cycling bridge, as the existing road bridge is too narrow. The cycling track then departs a little from the lake and then approaches it again at the stationary km 5,523. From km 5,619.40 to km 5,797 there is a newly built gallery Pod Ključem, along which has already been completed a section of a cycling track for mixed traffic of cyclists and pedestrians in the width of 2.0 meters. In front of and behind the above-mentioned gallery, a cycling link takes place on a large part of the track on supporting structures. At the end of the processing section, the track connects to an existing macadam path.
Additional information
- Contracting Authority: The municipality of Tolmin
- Project phase: detailed design, as-built design