PS Boršt 1

REHABILITATION OF THE CONNECTION BANK AT VIADUCT BORŠT 1, FROM PROFILE P75 TO P79 AT MOTORWAY RAZDRTO-VIPAVA; REBERNICE

In the area of the connection embankment of the support P6, viaduct Boršt 1, visible damage to the left half of the road between the profiles P75 to P79 occurred. As a supporting measure, we have produced a project of an anchored pile wall of 96.6 m in length. Piles with fi 150 with 2.5 m and 3 m are selected. Piles length is from 18.6 m to 13.5 m. Piles are connected to the connecting beam of the indicative dimensions B/H = 190/150 cm. The pile wall is prestressed with 4 cable anchors.

Additional information

  • Contracting Authority: DARS d.d.
  • Project phase: Basic design, detailed design

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

Preliminary design, basic design motorway Gruškovje

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.