Luka Koper – replacement of switch No. 128 (tracks 5 and 6: feasibility study 3)

REPLACEMENT OF SWITCH NO. 128

The study covers the direction and height of tracks 5 and 6 and switch 128.

Additional information

  • Contracting Authority: Luka Koper INPO d.o.o.
  • Project phase: feasibility study

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.