THE TRACK HEIGHT AND DIRECTION LAYOUT
The direction and height of tracks Nos 19 and 20 are processed in the feasibility study. An unfavourable elevation situation calls for rehabilitation. Large depressions around pile bridging facilities no longer allow safe driving. It was necessary to lift the gradient level up to 40 cm.
Additional information
- Contracting Authority: Luka Koper INPO d.o.o.
- Project phase: feasibility study