Luka Koper, tracks 31-36 (feasibility study 1)

The study covers the direction and height of the tracks and the arrangement of the drainage of the track plan. It is used to replace thresholds and to regulate tracks in both direction and height.

Additional information

  • Contracting Authority: Luka Koper INPO d.o.o.
  • Project phase: feasibility study

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.