The study covers the direction and height of tracks 11 and 12b in the 1st track group. It serves the direction and height of the tracks in the narrow area by shifting the switch no. 105 toward the beginning of the station.
Additional information
- Contracting Authority: Luka Koper INPO d.o.o.
- Project phase: feasibility study