Luka Koper, tracks 11 in 12b (Detailed design: feasibility study 2)

The study covers the direction and height of tracks 11 and 12b in the 1st track group. It serves the direction and height of the tracks in the narrow area by shifting the switch no. 105 toward the beginning of the station.

Additional information

  • Contracting Authority: Luka Koper INPO d.o.o.
  • Project phase: feasibility study

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.