RECONSTRUCTION OF THE REGIONAL ROAD R2-420/1335 FROM KM 4+750 TO KM 5+750 WITH THE CONSTRUCTION OF THE FACILITY FOR THE EXTRA-LEVEL CROSSING WITH THE RAILWAY LINE DRŽ. BORDER (BORDER WITH THE REPUBLIC OF CROATIA) – DOBOVA – ZIDANI MOST
On the basis of the national detailed site plan, we have drawn the basic design and detailed design to regulate the crossing of a regional road with a railway line from level to extra-level. The length of the reconstruction of the regional road is approx. 1000 m. Other road infrastructure arrangements were needed, such as: deviations and interruptions of local roads and public routes, the arrangement of intersections and connections of local roads and regional road, the construction of underpasses under a railway line on a regional road by building supportive walls of the road excavations, access arrangements, the arrangement of alternative parking spaces, the extension of a sports field.
Additional information
- Contracting Authority: DRSC
- Project phase: Preliminary design, basic design, detailed design