REGIONAL ROAD R1-215/1162 TREBNJE – MOKRONOG FROM KM 1+188 TO KM 1+975
The section of the road which was the subject of the reconstruction also represented the remaining unreconstructed part of the road with a length of approximately 800 m. In km 1.370 the road level crosses the railway line Sevnica-Trebnje. Due to unfavourable horizontal elements and the width of the carriageway and the excavation without verges, a reconstruction of the road with an extra-level crossing of the railway line was envisaged. Overpass 4-1 goes over the railway line at km 1+816 in one 18m length range. By design, the structure consists of prestressed T-beams with a concrete plaque “in situ”. The ground plan is an inclined structure, the axes of the two traffic routes are at an angle of 50.1°. The free infrastructure gauge above the railway line is 5.96 m, taking into account future electrification of the line, which is sufficient for the prescribed free gauge of 5.75m.
Additional information
- Contracting Authority: DRSC
- Project phase: Basic design, detailed design, as-built design