HC Razdrto – Vipava junction

REBERNICE

Contracting Authority: Družba za avtoceste v Republiki Sloveniji

Investment value:

  • Covered entrenchment 8-1/1Rebrnice I, € 4,600,000
  • Covered entrenchment 8-2/1Rebrnice II, € 7,600,000
  • Viaduct 6-01 Boršt 1, € 2,800,000
  • Viaduct 6-3/1 Rebrnice, € 5,600,000
  • Pile wall Boršt 1, € 1,000,000
  • Pile wall Rebrnice, € 970,000

Description:

  • Covered entrenchment Rebrnice 1, length 130 m
  • Covered entrenchment Rebrnice 2, length 320 m
  • Viaduct 6-1/1 Boršt 1, foundations deep in wells, length 150 m
  • Viaduct 6-3/1 Rebrnice, foundations deep in wells, length 300 m
  • Anchored pile wall Boršt 1, length 100 m
  • Anchored pile wall Rebrnice, length 90 m

Design of multiple facilities on the line HC

The static design of the supporting structure is a continuous frame over 9 fields. The breaking construction is a box beam made of prestressed concrete, external dimensions of 384/205 cm. Intermediate supports are columns with a cross-section of 380 / 130 cm.  The columns have foundations in wells with a depth of 13 to 21 m and an internal diameter of 600 cm. The wells are surrounded above by a ring beam of 1.0/1.0 m which connects them in a transverse direction. This will increase the resistance to the avalanche of the ravine.

Additional information

  • Project phase: Basic design, detailed design

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.