REBERNICE
Contracting Authority: Družba za avtoceste v Republiki Sloveniji
Investment value:
- Covered entrenchment 8-1/1Rebrnice I, € 4,600,000
- Covered entrenchment 8-2/1Rebrnice II, € 7,600,000
- Viaduct 6-01 Boršt 1, € 2,800,000
- Viaduct 6-3/1 Rebrnice, € 5,600,000
- Pile wall Boršt 1, € 1,000,000
- Pile wall Rebrnice, € 970,000
Description:
- Covered entrenchment Rebrnice 1, length 130 m
- Covered entrenchment Rebrnice 2, length 320 m
- Viaduct 6-1/1 Boršt 1, foundations deep in wells, length 150 m
- Viaduct 6-3/1 Rebrnice, foundations deep in wells, length 300 m
- Anchored pile wall Boršt 1, length 100 m
- Anchored pile wall Rebrnice, length 90 m
Design of multiple facilities on the line HC
The static design of the supporting structure is a continuous frame over 9 fields. The breaking construction is a box beam made of prestressed concrete, external dimensions of 384/205 cm. Intermediate supports are columns with a cross-section of 380 / 130 cm. The columns have foundations in wells with a depth of 13 to 21 m and an internal diameter of 600 cm. The wells are surrounded above by a ring beam of 1.0/1.0 m which connects them in a transverse direction. This will increase the resistance to the avalanche of the ravine.
Additional information
- Project phase: Basic design, detailed design