In Zabiče we demolished the damned construction of the existing bridge over the Sevšček stream and built a new bridge. The bridge with a full range of 17 m has been expanded, a pedestrian walkway has been arranged, and the stream bed under the bridge has been arranged. We also renovated a section of the road connecting to the bridge.
Additional information
- Contracting Authority: Municipality of Ilirska Bistrica