Solkan-Plave cycle track

As part of the construction of a cycle track from Solkan to Plave, we built a section of a underpass under the railway track to Prilesje in a length of 3000 m. On this section we built a bridge over the Sopet stream, a stone fold to protect the banks under the railway track, arranged the surface of the cycle track and resting areas.

Official name: Cycle track 920100 Solkan – Plave from km 0+340 to km 9+610

Investor: Ministry of Infrastructure and Spatial Planning

Contracting Authority: Cestno podjetje Nova Gorica d.d.

Location: Solkan – Plave

Value of works (approx.): 330.000,00 €

Description:

  • The route of the cycle track is 7400 m long
  • Supporting / retaining walls
  • Deepening of the underpass with a staircase
  • Passes and small bridging structures

_IMAGE GALLERY

_see our other projects

Detailed design of cycling track Modrej pri Tolminu

Implementation plan of facilities in the Laško-Celje section

If you have any questions, contact us on telephone +386 5 331 00 20 or via the contact form. We will be happy to reply to you as soon as possible.