For the client the municipality of Vipava we built a municipal infrastructure in the settlements Podnanos and Vipava and a connecting channel between the two settlements in the total length of over 11 km, of which 9,080 m of faecal sewage, 1,015 m of rainwater sewage and 1,120 m of water supply. In addition, other municipal infrastructure has been implemented, such as TK cable pipeline, electricity cable pipeline and cable pipeline for the optical network. With a stone fold we also protected part of the stream beds of Pasji rep and Močilnik and paved many streets and roads in these settlements.
Additional information
- Contracting Authority: The Municipality of Vipava